McK
McK Cement
mckcement.com

Prepared for Eddy Tovar & HROC · Heidelberg Materials

Your newest remote operator should meet the 2 a.m. upset on a simulator.

CCR Academy gives every new specialist graded, coached practice on the upsets a real kiln can't schedule, and gives you proof of who is ready for the seat.

McK Cement · mckcement.com · October 23, 2026Simulator guide and courses

Our 30 minutes

Mostly your time. Then the kiln.

10min

Listen

How a new Optimization Specialist gets to a solo seat, and where the months go.

12min

Show

A live upset, run the way a remote operator runs it: screens, alarms and the radio.

8min

Plan

Whether one measured cohort is worth running.

10:30 CT10:4010:5211:00

If this is not a fit for HROC, say so and we part friends.

McK Cement · mckcement.com

Our starting view · correct us

HROC runs kilns it can't see, hear or smell.

24/7

Remote monitoring, operation and control of cement and grinding plants across the US and Canada

6–8mo

Of training before a new Optimization Specialist takes a seat

13

US cement plants, each with its own kiln, fuels and control screens

12h

Rotating shifts, including nights, weekends and holidays

“

New specialists don't need a cement background.

Our reading of the HROC Optimization Specialist postings

A smart bet on people. The risk sits in the rare, abnormal minutes a new operator has never seen.

Sources: Heidelberg Materials HROC announcement, Aug 2025 · Optimization Specialist postings · Heidelberg Materials USA

The gap we see

Advanced controls run the normal. Operators earn their keep in the abnormal.

18:00 · shift starts02:04 · ID fan surge06:00 · handover
NORMAL RUNNING

Process control and optimization keep the kiln steady inside its window.

ABNORMAL MINUTES

ID fan surge, cyclone jam, hot meal rush, cooler upset. A person decides what happens next.

THE SHORTAGE

Upsets are rare and can't be scheduled. A new specialist can finish the ramp without handling one live.

How does a new specialist meet an upset they haven't seen yet?

McK Cement · mckcement.com

Anatomy of a bad night · remote seat

Same ID fan surge. Two operators.

UntrainedNever seen one
02:04

Sees draft falling. Pushes the ID fan harder.

02:06

Fan vibration climbs. CO rises. The hood goes positive.

02:09

The fan trips on vibration and takes the kiln with it.

KILN DOWN · ~6 HOURS$42,000

of clinker lost, before restart fuel and refractory stress

TrainedRan it on CCR Academy
02:04

Calls it a surge, not a draft problem. Backs the fan off.

02:05

Trims feed and fuel to match the air the kiln has.

02:12

CO comes back down. Radios the plant to check the fan.

KILN RUNNING~7 t/h

given up on purpose, for a short time

What does that night cost on one of your kilns? Put in your numbers

At 100 tons/hour and $70/ton margin · McK Cement estimates

Your numbers · type in what a trip costs you

What one bad night costs a kiln.

t/h
$/t
h
$
/yr
lines
One bad night $67,000
Lost clinker $42,000Restart $25,000
Per hour down
$7,000
Per day down
$168,000
Per year, all lines
$134,000
If trained crews avoid 25% of those trips
$33,500/yr

Estimates for discussion. A market-limited plant can often make up lost clinker later; restart costs apply either way.

McK Cement estimates · defaults: 100 t/h, $70/t, 6 h, $25,000 restart

Who we are

Built by a cement man who ran a Lehigh kiln.

5cement plants managed by Gerry McKervey
40+years, quarry to kiln to boardroom
23real-world drills in CCR Academy
EN · ESplain words, by text or voice
Gerry McKervey · B.S. Mining Engineering, University of Missouri-Rolla

Live demo · drill U-02

2:04a.m.

The ID fan starts to surge.

  1. The first move
  2. The radio call to the field
  3. How the coach explains the result
Watch for these three things

Built for the remote seat

Practice the job the way HROC does it.

Screens and radio

Board, alarms, trends and a Field and Comms tab. The trainee sends the field to a damper and reads the reply.

Two-person drills

A second trainee joins from a phone as the field operator, so handoffs get practiced too.

Shift runs

20 to 60 simulated minutes, with 2 to 4 problems at random times. No warning that a drill has started.

Your own events

Load a historian file from a real upset. Specialists call it, then see what really happened.

Everything here is described in detail in the simulator guide.

McK Cement · mckcement.com

Training courses

A course path that fits inside your 6 to 8 month ramp.

WEEKS 1–2

Foundations

CCR 100 plus the process fundamentals workshop

WEEKS 3–4

Kiln

CCR 110 · 7 kiln and burner drills

WEEKS 5–6

Preheater & cooler

CCR 120 and 130

WEEKS 7–8

Mills & trips

CCR 140 and 150

WEEKS 9–12

Shift readiness

CCR 200 · shift runs, two-person drills, tests, sign-off

EACH UPSET COURSE

Practice until B or better, then pass the same drills in test mode.

AFTER SIGN-OFF

Monthly refreshers from each person's plan, plus replays of your own events (CCR 210).

TAILORED

We fit the courses to HROC's sign-off levels, plants and procedures.

Full catalog, with drills and assessments for every course: Simulator guide and courses

Sample path for a new Optimization Specialist

Proof of readiness

Proof you can show a plant manager.

PRACTICE, THEN TEST

Test mode removes all help and changes the upset each time. A pass means they know it, not that they remember it.

THE EXPERT RUN

The textbook response to the same drill is drawn over the trainee's own trends.

CREW READINESS

Ready, Close or Needs work for every specialist, plus a training record you can print or export.

When HROC takes a kiln, this is the evidence that the seat is ready. How it's graded

Training records support your program. They do not by themselves show compliance.

What your cohort report could look like

Eight specialists, twelve weeks on the simulator.

Example data
Week 12 / 12
Cohort average drill score0 to 100 · dashed line = Ready
Cohort readiness

HROC measures we'd track with you. You set the targets.

Time to a solo seatyour baseline → your target
Mentor hours per specialistyour baseline → your target
Trips on HROC-run kilnsyour baseline → your target
Plant manager confidenceyour baseline → your target
The measures are ones CCR Academy records today.

Proposed next step

One cohort, measured against your standard.

WEEK 0

Tune

One or two HROC kilns in the simulator. How

WEEKS 1–2

Baseline

Every specialist tests cold

WEEKS 3–10

Practice

The course path inside your ramp, with a coach after every drill

WEEKS 11–12

Report

Same tests. Results against your criteria

WHO

Your next cohort of Optimization Specialists, plus their mentors.

MEASURE

You pick: time to a solo seat, test scores, readiness, mentor hours. Scoring

TERMS

90 days, paid. The pilot fee is credited to a yearly plan.

McK Cement · mckcement.com

Straight talk

What this is, and what it is not.

IT IS
  • Practice on real upsets, as often as each specialist needs
  • A coach after every drill, in plain English or Spanish
  • Readiness evidence for every seat, by crew
IT IS NOT
  • A replacement for your mentors, buddy shifts or classroom simulator
  • Connected to any control system, ever
  • Plant sign-off. Your competent person still signs
McK Cement · mckcement.com

Next steps · fill in together

Agree the plan before we hang up.

StepOwnerWhen
Gerry McKerveygerry@mckervey.comSimulator guideAppendix
Click any owner or date to edit it live

Appendix · questions you may have

The details, one click away.

Click a tile to jump. Back returns you to where you were.

Appendix · we already have a simulator

Keep your classroom simulator. Add the reps in between.

 Classroom simulator, e.g. KHD SIMULEXCCR Academy
ScopeFull plant, raw materials to cement silosKiln line: preheater, calciner, kiln, cooler, ID fan. No finish mill model yet
ModelReal-time models, soft PLC logic, full interlocks, 20+ years refinedBrowser model with lags, noise, equipment limits and burner interlocks, built around drills
FormatInstructor-led sessions, often booked ahead10 to 60 minute drills and shift runs, on any shift
AccessLicensed seats or a shared systemAny browser; unlimited operators per kiln line
FeedbackAn instructor evaluatesAutomatic grade, safety gates, coach debrief, expert-run overlay
ProofCourse completionTests, readiness board, training record export
Track recordUsed across the Heidelberg group for yearsNew. No enterprise reference yet
Together

Before classDrills as homework

Between classesMonthly reps on costly upsets

After classTests show it stuck

New hiresDay-one drills in English or Spanish

Source: KHD SIMULEX product page, which lists HeidelbergCement as a user with a 24/7 shared training system.

Appendix · what upsets do you cover?

23 drills. The problems that cost plants money.

Kiln 8

  • K-01Coating collapse, kiln amp spike
  • K-02Clinker ring forming
  • K-03Ring collapse, material surge
  • K-04Cold kiln, high free lime
  • K-05Hot kiln, overburning
  • K-06Unstable burner flame
  • K-07Startup, ramp to full production
  • U-04Alternative fuel swings

Preheater 5

  • P-01Cyclone buildup forming
  • P-02High CO at calciner, short of air
  • P-03Preheater false air spiral
  • P-04Cyclone jam, meal not reaching kiln
  • P-05Downdraft calciner running hot

Cooler 3

  • C-01Snowman at cooler inlet
  • C-02Red river, poor clinker cooling
  • C-03Undergrate pressure drop

Mills 4

  • M-01Coal mill fire risk, rising CO
  • M-02Baghouse DP spike, cleaning fault
  • M-03Bag failure, dust breakthrough
  • M-04Raw mill trip, kiln interaction

Utilities 3

  • U-01Power dip, partial trip recovery
  • U-02 · TODAY'S DEMOID fan surge, draft loss
  • U-03False air leak

Plus shift runs: 20 to 60 simulated minutes with 2 to 4 problems at random times. Plants can add custom drills for their own trouble spots. Drill details

Each drill has an answer key: the ideal moves, the tempting wrong moves and the hard safety rules

Appendix · is it accurate for our kilns?

Tuned to your kiln lines, reviewed by your people.

1

You send

  • Preheater stages and calciner type
  • Cooler, fuels and alternative fuels
  • Screenshots of your control screens
HROC
2

We build the profile

  • 4, 5 or 6 stages; in-line or downdraft calciner
  • Alternative fuel at the burner or calciner, whole tires
  • Your screen colors; US or metric units
McK Cement · days, not months
3

Your best operator reviews

  • Runs the drills on your kiln
  • Checks the trends look like home
  • We adjust until they sign off
HROC training lead
4

Replay your own upsets

  • Export a historian CSV of a real event
  • Specialists watch it unfold and call it
  • Then see what really happened
Any plant, any trip

A teaching model, not a digital twin. It behaves like your kiln where the drills need it to: lags, noise, equipment limits and interlocks.

McK Cement · mckcement.com

Appendix · how is a specialist graded?

Graded the same way, every run, every plant.

Safety first

Break a hard safety rule and the run fails its safety gate, whatever else went right.

Three scores

Safety, economy (fuel and air per ton) and production. Shift runs add steady running and response time.

Help costs points

Hint −0.5 · next move −1.5 · show root cause −3. Crutches show up in the grade.

Test mode

No help. The upset arrives stronger or weaker and further along, different every time.

Expert overlay

The textbook run of the same drill is drawn over the specialist's own trends.

Ready means

  • Every safety drill at B or better
  • Three or more tests passed
  • A shift run at B or better
  • No safety gates in the last 30 days
ReadyCloseNeeds work

We can set this rule to match HROC's sign-off levels.

Records print and export to CSV to support an MSHA Part 46 program. They do not by themselves show compliance; your competent person signs.

Appendix

How plants train board operators today.

CapabilityOn-the-jobSeminar + simulatorCustom plant simulatorCCR Academy
Runs in a browser, no IT projectNoNoNoYes
Coach debrief after every drillNoNoNoYes
Available every shift, every crewPartlyNoPartlyYes
Readiness record per operatorNoPartlyPartlyYes
Time to first drillYearsNext sessionMonthsSame day
Cost modelHidden~$2,600 per person plus travelSix-figure project (est.)Yearly fee per kiln line, unlimited seats

Already using a classroom simulator? See how the two fit together

Public vendor materials reviewed Sept 2026. Custom simulator cost is a McK Cement estimate.
1 / 12 ← → to move